Extensions reach us in one of three ways. Here is what each one covers and when it happens, so you can work out where you are before you get in touch.

Footings and foundationsCavity and structural wallsSubcontract bricklaying
What we layTrench blockwork, up to damp courseInner blockwork leaf, cavity and outer brick skinWhatever the programme has reached that week
When it happensOnce the trenches are dug and the concrete has gone offAfter the slab, up to wall plateWhenever your build gets to the brickwork
Who usually books itHomeowners running their own buildHomeowners and builders, roughly evenlyBuilders and project managers
What moves the priceDepth, ground conditions and how much blockwork there isSize of the extension and the brick being matchedDays on site and how many hands you need
Matching your existing brickNot needed, none of it showsYes, the outer skin is matched to your houseOnly if the brick has not been chosen already

Swipe to see every column

On every extension job we take on

The same whether we are doing the footings, the walls above them, or all of it.

A free, no-obligation quotation

In writing, worked out from how long the job will take, and agreed with you before anything is ordered.

A visit usually inside the week

Message us on a Monday and we will normally have been out to look at the job before that week is out.

NVQ Level 2 and a CSCS card

A Level 2 Diploma in Bricklaying, and a CSCS card for working on a builder site.

Public liability cover up to £1 million

Carried on every job, whether it is your garden or a contractor site.

A five-year workmanship guarantee

If something we have built fails inside five years, we come back and put it right.

A site left clean at the end of each day

We tidy down daily, and all the waste leaves with us when the job is finished.

How an extension job runs

Four stages, the same on a set of footings as on the whole shell.

Jack comes and looks at it

Get in touch and Jack will usually be out that week to see the job and go through what you want doing. You get a free, no-obligation quotation in writing.

Materials ordered, start date agreed

Once you are happy with the price we order what is needed and book a start date that fits round the rest of the build. The areas around the work get protected before anything begins.

We build it

The blockwork and the brickwork go up to a high standard, and the site is left clean and tidy at the end of every day.

We walk you through it

Everything gets cleaned down, all the waste goes with us, and we walk you through the finished work to make sure you are happy with it.

What to know before you book extension brickwork

Extension brickwork is the part of a build most people think about last and look at first. The footings end up buried and the inner blockwork gets plastered over, but the outer skin is the bit you see from the garden every day afterwards. It is worth having it laid by a bricklayer who cares whether it matches the house.

Below ground it is blockwork rather than brick. Blocks go into the trenches once the concrete has gone off and come up level to damp course, so the walls above them start square. That stage gets looked at before it is covered up, which is a good reason not to rush it. Come up out by a course and the whole build is correcting for it all the way to the roof.

Above the slab, a domestic extension is normally a cavity wall. An inner leaf of blockwork, a cavity, and an outer skin of facing brick tied back to it. The inner leaf takes the load, the cavity keeps the weather out, and the brick is the part anyone ever comments on. Most of the difference between a good job and a poor one sits in the setting out and the pointing, which is unglamorous and matters enormously.

Matching the brick is the question we get asked most about brickwork for an extension. On a 1930s semi or an older terrace around Bournemouth or Poole the original brick often is not made any more, so the work is finding the closest thing that is, then getting the mortar colour and the joint right. Do that and the extension reads as part of the house. Get it wrong and the new work announces itself from the end of the garden.

We do not publish a starting price for a blockwork extension, because a single-storey rear extension and a two-storey side return are not the same job, and a headline figure would only mislead you. What moves the cost is the size of the extension, how much of it is blockwork and how much is facing brick, the ground conditions, the access for materials, and whether you want a detail like a soldier course or an arch over the openings. We price on how long the work will take, the figure comes to you in writing after a visit, and it does not move afterwards. We do not claim to be the cheapest, and we would rather tell you that now than have it surprise you later.

A fair bit of extension work reaches us through builders rather than homeowners directly, and we are happy either way. If you already have a main builder and just need an extension bricklayer for the shell, we subcontract on domestic projects and work to your programme. If you are managing the build yourself, we will tell you plainly where our part starts and stops, so there is no gap between us and whoever is doing the groundwork or the roof.

We work across Dorset and into Hampshire, up to about an hour from Ferndown. That takes in Bournemouth, Poole, Wimborne, Christchurch, Broadstone, Ferndown, Ringwood and the towns around them.

Questions about extension brickwork

If yours is not here, message us and we will answer it properly.

Do you lay the brickwork on house extensions?

Yes, and it is the work we most want more of. We take extensions on for homeowners and for builders, covering the footings blockwork, the cavity and structural walls, and the facing brick on the outside. Tell us which of those you need and we will quote for those parts rather than the whole thing.

Do you do the blockwork as well as the brickwork?

Both. Below damp course an extension is blockwork, the inner leaf of a cavity wall is blockwork, and the outer skin is brick. We lay all of it, so you are not booking two trades to build one wall.

Can you match the brick on my house?

That is usually the first thing we look at on the visit. Brick matching is part of any extension we build, and on older housing the original brick often is not made any more. We find the closest match available and get the mortar and the joint right so the new work sits in with the old. If a close match is not possible we will tell you that before you commit, not afterwards.

How much does extension brickwork cost?

We do not publish a starting figure for extension work. The size of the extension, the brick and the ground move it far too much for one number to mean anything to you. Every job is different, so we come and look at it and give you a free, no-obligation quotation in writing after the visit. The price is worked out from how long the job will take, and it does not change once you have it.

How quickly can you come and look at the job?

Usually the same week. Message us on a Monday and Jack will usually get out to look at the job that week, sometimes the next day or that evening, and we try to have a quote with you by the end of that week. Quick quoting and quick replies are what customers mention most often in our Google reviews.

Will you work alongside my builder?

Yes. We subcontract bricklaying on domestic projects and work to the builder's programme rather than our own. You deal with us for the brickwork and the blockwork, and your builder runs everything else.

Is extension work guaranteed?

Yes, five years on our workmanship. If something we have built fails inside that time we come back and sort it out. We also carry public liability cover of up to £1 million.

Do you cover Bournemouth and Poole for extensions?

Both, along with Wimborne, Christchurch, Broadstone, Ferndown, Ringwood and the towns around them. We work across Dorset and into Hampshire, up to about an hour from Ferndown.

Where we lay extension brickwork

Dorset and into Hampshire, up to about an hour from Ferndown.

Get a quote for your extension brickwork

Tell us what stage the build is at and we will come and look at it, usually within the week. The quotation is free, it comes in writing, and there is no obligation.