NewPatioLayingCostinBournemouth
A proper rebuild from the ground up, not slabs dropped onto bare soil: excavated, drained and laid so it stays flat for years.
- Full excavation and a compacted sub-base
- Falls built in so water runs away from your house
- Free, no-obligation site visit and written quote


- 5★Rated on Google
- 5 yearsWorkmanship guarantee
- Up to £1 millionPublic liability cover
- NVQ Level 2Qualified, CSCS carded
New Patios
What Goes Into A New Patio
A new patio isn't just slabs laid on the ground. We dig out enough depth for a proper sub-base, compact it in layers, and build in a fall so rainwater runs away from the house instead of sitting against the wall. Edges get a solid restraint so the pattern doesn't creep, and every joint is filled properly, not just brushed with sand. It suits any garden that's currently grass, tired concrete, or an old patio that's had its day.
- Excavated and compacted sub-base, not laid onto bare soil
- Falls built in so water runs away from the house
- Solid edge restraint and properly filled joints
New PatiosHow We Get A New Patio Right
Three stages, and the ground stays dry under every one of them.
01Free Site Visit & Quote
Jack visits, talks through what you want and where, and puts together a detailed written quote. No pressure, no obligation.
02Excavation & Sub-Base
The area is dug out to the right depth, the sub-base compacted in layers, and the falls built in before a single slab goes down.
03Laying & Finishing
The patio is laid, jointed properly and the site cleaned down each day, so you're not living on a building site the whole time.
5.0★
47 Google reviews
5 years
Workmanship guarantee
Up to £1 million
Public liability cover
NVQ Level 2
Qualified bricklayer, CSCS carded
New Patio Or Just Repointing?
Not every tired patio needs digging up. Here's the honest difference between the two.
| New Patio | Patio Repointing | |
|---|---|---|
| Best for | A patio that's cracked, sunken or was never right to begin with | A patio that still sits flat but has tired, open joints |
| What changes | Full rebuild: excavation, sub-base, falls and new slabs | Old joints raked out and refilled, slabs left in place |
| What it fixes | The ground underneath, so the surface stays flat | The surface only, not whatever's happening beneath it |
Swipe to see every column
What's Included As Standard
The groundwork that decides whether a patio lasts.
Excavation to depth
The area is dug out to a proper sub-base depth, not skimmed.
Compacted sub-base
Built up and compacted in layers so it doesn't move under the slabs.
Falls built in
The surface is graded so water runs away from your house.
Edge restraint
A solid edge so the pattern holds its line over time.
Proper jointing
Joints are filled properly, not just brushed with sand.
Site cleared daily
Waste and spoil removed and the site left clean and tidy each day.
Pricing
Every New Patio Is Priced After A Visit
Priced After We've Seen The Job
No two patios cost the same. The size of the area, how much digging it needs, the state of what's already there and how easy it is to get to all move the price, so we look at it in person before we put a figure on it.
- What the price is built from: time on site, materials and access
- A free, no-obligation quotation, given in writing
- No pressure and nothing to sign there and then
How A New Patio Runs, Start To Finish
The same four stages behind every job we take on.
Free Site Visit & Quotation
Jack comes out to look at the garden, talks through what's wanted and provides a detailed written quote.
Preparation
Materials are ordered, a start date agreed, and the surrounding areas protected before any digging starts.
Excavation & Construction
The area is excavated, the sub-base compacted and the falls built in, then the patio is laid and jointed to a high standard. The site is kept clean and tidy every day.
Finishing
Everything is cleaned down, all waste removed, and we walk you through the finished patio to make sure it's exactly what you wanted.
New Patios We've Laid
Photos from completed patios are on their way.
What Our Customers Say
Taken word for word from our Google profile.
5.0
James Hickman
Jack was excellent from first inquiry to the finished product. We needed an old set of French doors bricking up to match our existing window still height.
Dane Gardner
Jack is a real craftsman who repaired my steps and repointed my patio to a very high standard. From the start he was good at communicating, replying to messages quickly and providing a prompt quote.
Rosemary Collins
Jack did an excellent job rebuilding a section of our garden wall and repairing cracks in other sections despite having to work through challenging weather conditions and unexpected complications in relation to the groundwork.
Patio Projects
Before You Book, The Honest Answers
The doorstep worries, answered up front.
Will it make a mess of the garden?
Excavation is dusty and there's spoil to take away. We protect what's around the work area and clear everything down each day, so it doesn't build up.
What if access is tight?
Narrow side access or a walled garden doesn't rule it out. We look at access on the free site visit and plan the job around it before any digging starts.
What if it moves or settles later?
The work is covered by our 5-year guarantee, so if something isn't right after we've finished, we put it right.
What Affects The Price Of A New Patio, And What Goes Wrong Without The Groundwork
The size of the area, how much digging it needs, the state of what's already there and how easy the garden is to get to all move the cost of patio laying. A small patio on clear, level ground is a different job to a large one over an old concrete base with poor access, which is why every quote follows a site visit rather than a phone call.
Whether a patio needs planning permission depends on the site. Conservation areas, listed buildings and raised patios can all be different, so it's worth checking with your local council before booking anything in.
Most patio problems trace back to what's under the slabs rather than the slabs themselves. Skip the sub-base and it sinks and cracks within a couple of winters. Skip the falls and water sits against the house instead of running away from it, which is how damp gets started. Skip proper jointing and weeds and frost work their way back in. None of that shows on the day it's laid. It shows two winters later.
New Patio Questions, Answered
The questions we're asked most before someone books a patio.
How much does a new patio cost?
It depends on the size of the area, how much digging it needs and how easy it is to access, so we don't quote a figure without seeing the job. We'll visit, talk through what you want, and give you a free, written quote with nothing to sign there and then.
How long does laying a new patio take?
It depends on the size of the job and the ground conditions, so we'll give you a realistic timescale on the site visit rather than guess it up front.
Do I need planning permission for a new patio?
It depends on the site. Conservation areas, listed buildings and raised patios can all be different, so check with your local council first. We're happy to talk through your situation before you book.
Will you match paving I've already got?
Where you're extending an existing patio or matching a path, tell us on the site visit and we'll look at what's there before we price the job.
What if my garden already floods or holds water?
That's exactly what the falls are for. We grade the patio so water runs away from the house rather than sitting on the surface or against the wall.
Do you lay patios near me in Dorset and Hampshire?
Yes. We lay new patios across Dorset and into Hampshire, up to about an hour from Ferndown.
Not Sure This Is The Right Page?
If your patio already sits flat and level, this might not be the job you need.
Where We Lay New Patios
Dorset and into Hampshire, up to about an hour from Ferndown.
Bournemouth
New patios for gardens across Bournemouth, from seafront properties to suburban semis.
View BournemouthPoole
A regular area for us, from harbourside gardens to inland estates.
View PooleWimborne
Our registered base, and where a good share of our patio and wall work starts.
View WimborneBroadstone
Close to home and well within reach for a site visit.
View BroadstoneReady For A New Patio?
Get a free, no-obligation quote for your garden. We'll visit, talk through what you want, and give you a written price with nothing to sign there and then.
Get a free quote
Tell us what you need and we'll come back with a price. No pressure, no hard sell.
Prefer to talk? Call JFE Brickwork on 01202 028 343




