How Much Does a Garden Wall Cost?
What decides the price of a garden wall, told straight: its length and height, the brick and bond you choose, how much digging out the ground needs before we can build on it, and how easy the site is to get to. There is no figure to book against here, because we will not give you one before we have stood in front of your wall, and this guide explains why that is the honest answer rather than an evasive one.
What actually decides what a garden wall costs
There is no single figure that answers this honestly, and every wall we quote is priced only after we have stood in front of it. What we can do here is explain exactly what moves the price, so you understand why one garden wall costs more than another before we ever turn up with a tape measure.
The first two numbers are length and height, and they are the simplest way to picture the difference between two jobs. A wall twice as long takes roughly twice the bricks and roughly twice the days, and height compounds it: a wall built up towards head height needs working platforms a knee-high edging wall never will, on top of more courses of brick and more mortar in every one of them. Two walls that look about the same size on a plan can still be different jobs once the height is measured properly.
The brick you choose moves the price as much as the size does. A standard facing brick is the cheapest starting point. A brick matched to sit alongside brickwork already on the house, or against a boundary wall next door, costs more to source and is sometimes tracked down specially. Engineering brick, chosen where a wall has to cope with standing water or contact with the ground, costs more again. None of that is a mark-up on our part. It is what the brick itself costs before a single one goes in the wall.
Then there is what is under the ground, which a homeowner can never judge from the surface and is usually the biggest single swing in the price. Every wall needs foundations, and foundations need digging out to solid ground before anything is built on top of them. On some plots that is straightforward: dig to a sensible depth and it is ready. On others the ground is soft, full of old rubble, close to a drain, or on a slope that needs stepping, and all of that adds days before a single brick is laid. We have taken on a garden wall where the groundwork alone threw up more complications than the wall built on top of it, in weather that added time nobody had allowed for either. None of that shows from the pavement, which is exactly why it cannot go on a website.
The pattern the bricks are laid in, known as the bond, is the next lever on the price. A stretcher bond, the plain pattern most garden walls use, is the quickest to lay and the reason most walls are priced the way they are. A Flemish bond, or a semi-bespoke pattern like the wall Jack built in Bournemouth, takes longer brick by brick because every course is doing more work, and a pattern that takes longer to lay costs more to build. It is a skilled bond a lot of bricklayers steer away from for exactly that reason. We will price either honestly, and tell you the difference before you decide which one you want.
Access is the one people rarely think about until it becomes the reason a job runs long. A wall with a clear run from the road, room to mix and stack materials nearby, and nothing fragile to protect on the way through, is quicker to build than one behind a narrow side gate where everything, brick, sand, cement, has to be carried by hand. An easy-access wall is our favourite kind of job to quote, not because it is easier work, but because none of that carried time ends up in your price.
What is already on the site before we start matters just as much. A new wall built on clear ground is one job. A wall that replaces an old one that has to come down first, has been undermined by a tree root, or is leaning and needs taking apart carefully rather than knocked over, is a different job wearing the same name. We look at what is there before we quote, not after we have started, so nothing about the ground you are standing on becomes a surprise once work is under way.
Put those together, length, height, the brick, the ground beneath it, the bond and the access, and it should be clear why a figure typed into a website would not survive contact with your wall. A number built for an average garden wall on average ground is not a number for your garden wall on your ground. It is either too low, which is a promise we would then have to break, or too high, which loses you a fair price for no reason. Neither serves you.
So the quotation is free, it is written, and it carries no obligation to go ahead with it. We come out, measure the length and height, look at the ground and the access for ourselves, ask what brick and bond you have in mind, and give you a figure built for your wall rather than somebody else's. That is not a way of avoiding the question. It is the only honest way to answer it.
Repair it, rebuild it, or build a new one
Three different jobs, and the cheapest of them is often the right answer. This is how we tell them apart when we come out.
| Repair a section | Rebuild what is there | Build a new wall | |
|---|---|---|---|
| What it involves | Cutting out the damaged brickwork and repairing the cracks, with the rest of the wall left standing. | Taking down the part that has failed and rebuilding it so it sits in with what stays up. | Digging out, the footings, and the wall built up from the ground. |
| How it is priced | After a visit, on how long the repair will take. | After a visit, worked out the same way as a new wall. | After a visit, on the length, height, ground, brick and bond. |
| Matching your existing brick | Yes, and it is most of the skill in the job. | Yes, and on older brickwork that takes some hunting. | Only where the new wall has to sit next to brickwork that is already there. |
| When it is the right call | Damage or cracking in a wall that is otherwise sound. | One section has gone. We have rebuilt a front garden wall that had been knocked down, and on another job rebuilt one section of a garden wall and repaired cracks in the other sections. | There is no wall yet, or what is there is past saving, or you want something better than what you have got. |
| The honest catch | A patch is only right if the rest of the wall is sound. If it is not, we will tell you. | The new work has to match the old, and an exact match is not always still made. | The most work of the three, and the bond you choose changes how long it takes. |
| Five-year workmanship guarantee |
Swipe to see every column
The short version
If you read nothing else on this page, these are the things that decide what your wall costs.
Six things set the price
Length, height, the brick, the ground beneath it, the bond and how easy the site is to get to. Change any one of them and the figure moves.
You are paying for days, not metres
We work every price out from how long the job will take us. That is why there is no price per metre on this site, and why we will not guess one over the phone.
What is already there adds days first
A wall that has to come down, ground that turns out worse than it looked, and a garden we cannot get a barrow into all add time before a single new brick is laid.
A skilled bond costs more to lay
Flemish bond and other decorative patterns are more time consuming to lay, so they cost more. That is exactly why a lot of bricklayers steer away from them.
How we price a garden wall
What Your Wall Actually Costs
How We Price a Garden Wall
We do not publish a price list for garden walls, because two walls that look the same size on paper are rarely the same job once we have seen the ground underneath them. What it costs comes down to the length and height, the brick and the bond you choose, how much digging out the ground needs before we can lay foundations, how easy the site is to get to, and what is already there to come down or work around. We come and look at all of that for ourselves, then send a written quotation with no obligation to go ahead. We are not the cheapest bricklayers you will find, and we would rather tell you that now than put a number here that would not survive contact with your wall.
- Priced on length, height, the brick, the ground, the bond and access, not a rate per metre
- A free, written quotation, with no obligation to go ahead
- Every finished wall carries a five-year workmanship guarantee, and we carry public liability cover of up to £1 million
Nothing is charged, and nothing is ordered, until you have the figure in writing.
The questions that come after this one
What people ask once they have read this far.
Is there an average garden wall cost we can budget against?
Not one we would give you honestly. What a garden wall costs is built from its length and height, the brick and the bond you choose, how much digging out the ground needs, and how easy the site is to get to, and every one of those varies from garden to garden. An average built out of somebody else's wall would tell you nothing about yours, and it would only set you up for a shock either way. The quotation is free and there is no obligation, so the quickest route to a real number is to let us come and look at it.
Does a Flemish bond or a decorative pattern cost more to build?
Yes. A skilled bond is slower to lay, brick by brick, than a plain stretcher bond, and time on site is what the price is built from. It is also why a lot of bricklayers steer away from one. Jack built a semi-bespoke bond wall in Bournemouth and it is work he takes pride in, so if you have been thinking about one, ask us and we will price a plain wall and a patterned one so you can see the difference.
What does the ground under a garden wall have to do with the price?
More than most people expect. Every wall needs foundations, and foundations need digging out to solid ground before anything is built on top. On some plots that is straightforward. On others the ground is soft, full of old rubble, or close to a drain, and all of that adds days before a single brick is laid. It is the part of the job you cannot see from the pavement, which is exactly why it has to be looked at rather than guessed at.
How soon will we have a price for our wall?
Message us on a Monday and we will normally be out looking at the wall that week, sometimes the next day or that evening. We try to get the written quotation across to you by the end of the week. Quick responses and quick quotes both come up in our Google reviews, unprompted, so it is not a line we have made up for a website.
Are you the cheapest bricklayers we will find?
No. We might be cheaper than some, but we are not cheap and we will not pretend otherwise. We price a job on how long it will take us to build it properly, and we would rather stand behind a wall for five years than win the job on a number that does not hold once we are on site.
Ready to get it priced?
The wall work we do most, and where to start.
01Garden wall building
New garden and boundary walls, rebuilds, and front walls that have been knocked down. The service this guide is about.
Learn more
02Driveway walls
Boundary and entrance walls either side of a drive, built to sit in with the house or the wall they run into.
Learn more
03Retaining walls
For a sloping garden or a bank that needs holding back, rather than a boundary you simply want marking.
Learn more
04Decorative brickwork
Flemish bond and the other skilled patterns a lot of bricklayers steer away from. Slower to lay, so it costs more.
Learn more
Get a free quote
Tell us what you need and we'll come back with a price. No pressure, no hard sell.
Prefer to talk? Call JFE Brickwork on 01202 028 343