Skip to content
Recent Work

GardenStepsRebuiltinBrickandSlab,Bournemouth

Tired, broken sleeper steps replaced with a block and brick flight, faced in a slab the customer chose, with a lower and easier step.

  • Old sleeper steps ripped out
  • Block and brick flight on a concrete foundation
  • Lower, easier steps to climb
The finished garden steps in Bournemouth, slab treads rising towards the house

From Sleepers to a Proper Flight of Steps

The old steps up this Bournemouth garden were timber sleepers with gravel between them. The sleepers had gone tired and broken, the gravel had spread, and the steps weren't safe to walk up any more.

We ripped them out for a blank canvas, laid a concrete foundation, and built a new flight in block and brick. The treads and risers are slabbed in a textured concrete slab the customer picked out themselves.

Each step is now lower, with less distance between them, so it takes less effort going up and coming down. That was the customer's own brief: steps they'll still be comfortable on in years to come.

After
Before
BeforeAfter
Garden steps, Bournemouth.

The Job

Why the Steps Came Out Rather Than Being Patched

The brief was to make the steps safe again. Swapping out the worst sleepers would have kept the same problem: timber that breaks down and moves, with steps higher and further apart than they needed to be. So the whole flight came out and started again from a concrete base.

  • Old sleepers and gravel ripped out
  • Concrete foundation under the full flight
  • New steps built in block and brick, then slabbed
The old timber sleeper steps with gravel and fallen leaves, before the rebuildBefore

What Went Into These Steps

Old steps ripped out

The sleeper steps and gravel came out, leaving a blank canvas to build on.

Concrete foundation

A concrete foundation laid along the line of the new flight.

Block and brick steps

Each step formed in blockwork and brick.

Slabbed treads and risers

Faced in a textured concrete slab the customer chose.

A lower rise

Every step is lower than the old ones, so there is less height to climb each time.

Less distance between steps

A shorter stride from one step to the next, easier going up and coming down.

How the Job Ran

Clearing out

The sleepers and gravel came out, leaving a blank canvas.

Foundation

Concrete laid along the line of the new flight.

Building

Each step formed in block and brick at the new, lower height.

Slabbing

Treads and risers faced in the slab the customer chose.

Steps That Have Seen Better Days?

I'll come and look at the job, measure up and get a written quote across to you. Free, and no obligation.

Get a free quote

Tell us what you need and we'll come back with a price. No pressure, no hard sell.

Prefer to talk? Call JFE Brickwork on 01202 028 343

Get a Free Quote