RetainingWall,GardenStepsandPatio,Verwood

A sloping garden in Verwood, reworked with a Flemish bond retaining wall, safer steps up the middle and a new patio at the bottom.

  • Flemish bond retaining wall
  • Safer steps up to the top tier
  • New patio on a compacted sub-base
The new brick retaining wall and steps cut into the garden bank in Verwood

A Bank You Can Actually Get Up

The old steps ran up the right-hand side of this Verwood garden, next to an old low wall and a small patio at the bottom. The customer wanted a safer way up to the top tier.

We took the old steps down and built a new brick retaining wall in Flemish bond, with new steps going up the middle of it. The top of the wall is double slabbed, so there is room to reach the planting above.

At the bottom we dug out a new patio and laid it on a full bed of mortar, tied in to the wall and the steps.

After
Before
BeforeAfter
Rear garden, Verwood.

The Job

What Sits Under the Wall and the Patio

A retaining wall holds back the weight of a whole bank, so it is only as good as what it stands on. The ground was dug out for the steps and the wall, and concrete footings went in before a single brick was laid. Each step was measured and set out first, then the wall was built around them.

  • Old steps demolished and the waste taken away
  • Concrete footings under the wall and the steps
  • Patio on a membrane and a compacted Type 1 MOT sub-base
The garden before the work, with the old steps up the right-hand side of the bankBefore

What Went Into This Garden

Old steps demolished

The old steps taken down and the waste taken away.

Concrete footings

Ground dug out for the wall and steps, with concrete footings to lay the masonry on.

Steps set out and built

Each step measured and set out, then built, with the retaining wall formed around them.

Flemish bond brickwork

The retaining wall built in Flemish bond.

Double slabbed along the top

Room along the top of the wall to reach the planting above.

Patio on a proper sub-base

A membrane and Type 1 MOT compacted with a wacker plate, then slabs on a full bed of mortar.

How the Job Ran

Clearing

The old steps demolished and the waste taken away.

Groundwork

The ground dug out for the steps and the wall, and concrete footings put in.

Steps and wall

Each step measured, set out and built, the retaining wall formed around them and double slabbed along the top.

Patio

The patio area dug out, a membrane and Type 1 MOT compacted with a wacker plate, and the slabs laid on a full bed of mortar to tie in to the wall and steps.

Got a Sloping Garden Like This One?

I'll come and look at the job, talk through what the ground needs, and get a written quote across to you. Free, and no obligation.

Get a free quote

Tell us what you need and we'll come back with a price. No pressure, no hard sell.

Prefer to talk? Call JFE Brickwork on 01202 028 343

Get a Free Quote